How Does Solar Work With FPL (Florida Power & Light)?
Short answer: as an FPL customer, your solar system connects to the grid through FPL’s interconnection process, and exported power is generally credited under FPL’s net metering program, which your installer will help set up as part of your project.
Quick answer: If you’re an FPL customer, going solar involves an interconnection agreement with FPL in addition to local permitting. Once approved, your system typically operates under FPL’s net metering arrangement, crediting you for solar power you export to the grid.
The FPL-specific steps in your project
In addition to your local building permit, your installer will submit an interconnection application to FPL on your behalf. This is a separate approval process from your local building permit and must be completed before your system can be legally turned on.
FPL reviews the application to confirm your system meets their technical and safety requirements for grid connection, which is a standard step for any solar customer on their grid, not something unique to your installation.
What to expect with billing and metering
Once your system is approved and activated, FPL will typically install or configure a meter capable of tracking both the power you draw from the grid and the power you export back to it. Your monthly bill then reflects the net difference under their net metering program.
Exact billing mechanics and any applicable fees can change over time, so it’s worth confirming current details with FPL or your installer as part of your specific proposal.
See what solar and battery storage would actually do for your home
We will pull your last 12 months of utility data, model your real consumption, and show you exactly what a system would cost and produce — no obligation, no pressure.
Frequently asked questions
Do I need FPL’s approval to install solar?
Yes. In addition to your local building permit, your installer submits a separate interconnection application to FPL, which must be approved before your system can be legally connected and activated.
How long does FPL interconnection approval typically take?
Timelines can vary based on FPL’s current volume and your specific system, so it’s best to ask your installer for a current estimate as part of your project timeline rather than assuming a fixed number.
Will FPL install a new meter for my solar system?
Typically yes, FPL will install or configure a meter capable of tracking both the electricity you draw from the grid and the electricity you export, which is standard for their net metering program.
Does my installer handle the FPL paperwork for me?
In most cases yes, a qualified installer manages the interconnection application and coordinates with FPL as part of a turnkey installation, so you’re not navigating that process on your own.
Can I still go solar if FPL is my utility?
Yes. FPL customers regularly go solar, and the process simply includes FPL’s interconnection approval as an additional step alongside standard local permitting.
Related guides
- How solar permitting and inspection works in Florida
- How does net metering work in Florida?
- Home solar, battery and EV charging in Florida
- Solar systems
- Battery storage
- Florida solar by city
Figures on this page are typical industry averages for planning purposes and assume Florida’s 14.5¢/kWh average residential rate and 5.5 peak-sun hours per day. Your actual numbers will differ based on your utility, roof, and system — request a free evaluation for figures specific to your home.